Windscammers
International wind turbine fraud?

First posted
Tuesday April 19, 2016 17:18
Updated
Saturday February 11, 2016 11:59

Windjammers. Windscammers different.

PNM's Integrated Resource Plan for 2017. IRP 2017 began 6/30/16.

Now, the less gullible among Germany’s Greens have worked out that wind power is the greatest economic and environmental fraud of all time.

Wind and associated [wind turbine electronics and RTOS software] industries scamming PRC

broken china wind turbines.

The Chinese government has halted the expansion of wind power in its northern provinces where a large number of turbines are churning out [erratic and intermittent] power that's being wasted.

Hundreds of wind turbines in the Netherlands are operating at a loss and could soon be demolished, according to an article published Thursday by the Dutch financial newspaper Financieele Dagblad.

Globally, only 30 percent of total wind power capacity is actually utilized due to its intermittent and irregular [erratic] nature.

Globally, less than 30 percent of total wind power capacity and 20 percent of solar capacity are actually utilized; the disparity is due to the intermittent and irregular [erratic] nature of green energy.

bad idea?

texas wind turbine fraud.

04/04/16

So when a Texas businessman solicited investors for his renewable energy company, Wind Plus, Inc.—whose stated business goal was to find and develop land suitable for wind farm construction—he had no problem raising $3.7 million from nearly 100 individuals in 11 states. Unfortunately for the investors, that businessman—David Lyman Spalding—was not exactly environmentally conscious, and he had no intention of following through on his business plan. Instead, he took their money and stuffed the majority of it into his own pockets.

$160,000,000 + $430,000,000 + $50,000,000 = $640,000,000 New Mexico wind farm bonds?



Wind turbine erratic and intermittent electricity sales revenue sufficient to cover mechanical, electronics, software maintenance and decommissioning costs?

Construction and installation costs too?
G. Removal of Defective or Abandoned Wind Energy Systems

1. Any wind energy system found to be unsafe by the building official shall be repaired by the owner to meet federal, state and local safety standards or removed within six (6) months.

2. Any wind energy system for which electricity is not generated for a continuous period of twelve (12) months shall be considered abandoned and the owner of the system shall remove the turbine within ninety (90) days of receipt of notice from the County instructing the owner to remove the abandoned wind energy system.

3. Decommissioning plans shall be submitted as part of the application for any wind energy system that describes the anticipated life of the wind power project, the estimated decommissioning costs in current dollars and the anticipated manner in which the wind power project will be decommissioned and the site restored.

4. Decommissioning shall include removal of wind turbines, buildings, cabling, electrical components, roads, and any other associated facilities.

5. Disturbed earth shall be graded and re-seeded, unless the landowner requests in writing that the access roads or other land surface areas not be restored.

6. A performance surety, in a form approved by the County Attorney, shall be submitted by the applicant prior to the issuance of a building permit in order to ensure removal of the wind energy facility when it is no longer to be used for wind generation.

__


Friday April 29, 2016 20:22

Decommissioning cost?


denmark wind power myth
Electronics and software maintenance costs?
Hahaha.
$ compared to revenue from erratic and intermittent electricity sales?
Assume a wind turbine has a payback of investment of say 10 years without subsidies; if it won’t be maintained beyond the term of the tax shelter, nominally 5 years, it won’t operate for 10 years. In real economic turns, it won’t payback half of what it cost to build it. It won’t produce the energy it took to make it.





Thursday May 12, 2016 13:00


 

more tan 1,000 erratic and intermet megawatts

How computed?
 
nm joins the 1 gigawatt club.




Change is on the horizon in central Torrance County 12 miles northeast of Willard.





edf renewable energy.
EDF SA, Grimbert said, is 85 percent owned by the French government
and 15 percent publicly traded.

GE Stock Rally Seen at Risk as JPMorgan Makes Lone Sell Call.






Wednesday May 18, 2016 17:22

Search for Iberdrola El Cabo wind farm Saturday May 14, 2016.

Not found.

Furthest search point east of Willard, New Mexico.



North just east of Willard.
Partial decommission of wood windmill tower?



Wind turbine maintenance more expensive than windmills because of addition of electronics and software
to mechanical issues?


Whoops. Should be susan sponar of PNM Resources.






Iberdrola Renewables Resumes Full Construction at El Cabo Wind Farm
 
Art Sasse, Iberdrola Renewables, 503-796-7740 phone message May 12, 2016.








Wednesday June 1,2016 10:31

Done genocide.
Spy sting: Few at the Swiss factory knew the mysterious visitors were pulling off a stunning intelligence coup -- perhaps the most audacious in the National Security Agency's long war on foreign codes.













Tom Bowman.

Doing liberal arts 'educated' altenergy treason.

Tuesday May 23. 2016 18:04

Vestas wind turbine American Windw Power Center Lubbock,TX May 19, 2016.



Wind turbine not spinning but making noise.

Bolts restraining turbine tower from toppling rusted.

Wind turbine tower bolts may need to be retorqued.

Wind turbine bolt torquer equipped with air-powered torgue wrench, engineer reported.

Zilker Zephyr, Austin, TX May 21, 2016. Break from liberal arts 'educated' altenergy incompetence and fraud work.

@comcast.net hacked. Not copied to myonline ... .cox.net.

Who is sponsoring hacker[s]? NSA, altenergy ... particular wind, Microsoft, or others?











Mood music.

Friday May 27. 2016 11:01

Excess electric power disposal fee audio Thursday May 27, 2016.
tanya meadows wind speaker.
Why Vestas not spinning audio.

Wednesday June 1, 201610:23





Vestas not spinning video Tuesday May 24, 2016.

Applies to grid-tie excess solar generation too?
 
Turn off Vestas audio.

Cotton Coop all turbines spinning Tuesday morning. Ms Meadows correction: Three Samsung turbine, not Japanese.



Twitter account hacked. Can't change password.







Friday May 27. 2016 14:48
design news magazine.

jennifer.campbell@ubm.com

Jennifer Campbell Executive Editor at UBM Electronics
Education Plymouth State University,
BA, English 1993 – 1997


 
 





Amara Rosgus.




Cleveland wind project awarded $40 million DOE grant to develop Lake wind farm.


Wednesday June 1, 2016 07:44

Liberal arts 'educated' incompetent writers?



 




 










Thursday June 2, 2016 10:32

 
 




Mood music.

https://www.radiojavan.com/radio/player
Exelon Corp. said it is taking steps to shut down two nuclear power plants in Illinois, citing a lack of progress on state energy legislation.






Jack Welch, former GE chief and a longtime GOP supporter, tells CNBC the intense focus on preventing climate change spills over into "all kinds of policies.". [Wind and large-scale solar to the rescue?]


Friday June 10, 2016 06:59

Admiral porn.
Where do journalists come from? They are manufactured in America's universities in a liberal arts curriculum.

Mark Mathis



Iran and China are going nuclear.

US going wind and solar? Not coal. Liberal arts 'educated' Obama directs
.
El Cabo to be larger than Roosevelt.
Commissioners had previously approved issuing $430 million in IRBs for the Roosevelt Wind Project, which entails 150 wind turbines on 65,500 acres between Elida and Dora.
> 1B$ New Mexico wind turbine bonds? Scam/fraud?
 


Inside a Wind Turbine.

wind turbine electronics.
Failure mode comments important!!!



 

Exxon/Mobil comment and into left at Youtube wind turbine sites.



Enercon E126 - The Most Powerful Wind Turbine in The World.

What's inside a wind turbine?



Subscrbed.



Twitter account hacked.





GE's Predix Refocuses Business on Internet of Things.





predix operating system.








Photos not appearing. Hacked?

Workaround ... did not work.





Logitech C130 webcam. Lenovo g560 Windows 7 laptop running xp.



Tracfone LG L22C android lollip photos.



Hacked?





No. P different than p.

But Tracfone LG 22C phone number stolen.

Tracfone LG L39C android jelly bean hacked by HaX.R00T.

Contacts stolen. Contacts phoned. Their contacts stolen. Porn sent.

LG 22C android lollipop was supposed to be a secure phone. Number not given out.

Phone number apparently stolen for June 8 call from Google?

Returned phone call to wife's cousin, Don.

Don claimed June 9 he never phoned.

Hackers warning us of their expertist?

Warned at Frontier resturant by Richard Sauder.



June 9 54th wedding anniversary.

As testimony before the Sept. 11 Commission later revealed, al-Qaida had never tried to hide the fact
that it was at war with America. Bamford gives a detailed account of the 1996 Israeli attack on a refugee camp at Qana
in southern Lebanon, an event little noted in the American press but denounced by the rest of world and described
here as the "match lighting the fuse that would eventually lead to the World Trade Center."

scorpion silhouette named james.

THIS book's title leaves no doubt as to its major thesis. Bamford is one of the growing number of critics
who believe the Bush administration was determined to get rid of Saddam Hussein long before the terrorist attacks
on the World Trade Center and the Pentagon and that it used these attacks as a pretext for the war in Iraq.

[Reason: American Genocide?

Nojeh Coup

In July 1980, Zbigniew Brzezinski of the United States met Jordan's King Hussein in Amman to
discuss detailed plans for Saddam Hussein to sponsor a coup in Iran against Khomeini.
King Hussein was Saddam's closest confidant in the Arab world, and served as an intermediary
during the planning. The Iraqi invasion of Iran would be launched under the pretext of a call for
aid from Iranian loyalist officers plotting their own uprising on July 9, 1980 (codenamed Nojeh,
after Shahrokhi/Nojeh air base in Hamedan). The Iranian officers were organized by
Shapour Bakhtiar LINK, who had fled to France when Khomeini seized power, but was
operating from Baghdad and Sulimaniyah at the time of Brzezinski's meeting with Hussein.
However, Khomeini learned of the Nojeh Coup plan from Soviet agents in France and
Latin America. Shortly after Brzezinski's meeting with Hussein, the President of Iran.
Abolhassan Bani-Sadr quietly rounded up 600 of the loyalist plotters within Iran,
putting an effective end to the Nojeh Coup.[5] Saddam decided to invade without
the Iranian officers' assistance, beginning the Iran-Iraq war on 22 September 1980.]

Born: April 28, 1937, Al-Awja, Iraq.
Born: June 11, 1937, Bismarck, ND, USA.

Team member James Bamford at work.

Team member J orlin Grabbe at work.

How do Wind Turbines work?

5 Wind Turbine Fails.


Friday June 10 2016 11:02

$209 HP Stream 13 running windows 10/64. Consumes 6-14 W.



Decommissioning surety bond posted? :)







Privacy?



Playlist.



Should You Worry About 32 Million Hacked Twitter Passwords?



Tuesday June 14, 2016 10:15

 
 







Friday June 17, 2016 13:57

 

Shares of Avangrid are up over 12% thus far in 2016 and the power player is looking to generate additional profits through new wind farms and higher rates.








Saturday June 18, 2016 07:00

 
General Electric: A Bold Bet.








GE Rival Siemens Pairs With Gamesa To Build Wind Turbines.





Sunday June 19,2016 07:21

Hacker or legitmate?



Tuesday June 21,2016 16:48





Sent to hacked Tracfone LG L39C android jelly bean.



Two pw change attempts resulted in first character mismatch on IBM/Lenovo N500 windows vista laptop running IBM-installed xp pro.

Try email pw change.











First character mismatch.



Admiral William H Payne no email acknowledgment conversation.

The jewish problem.

US military liberal arts 'educated' final solution.
Commission them, then send them into combat.

And send science and engineering undergraduates to graduate school ... provided they agree to reinlistment provisions, of course.


Wednesday June 22, 2016 07:41

Knowledge of how the liberal arts 'educated' 'think' important to combat them.

 





 


Just IBM/Lenovo N500 problem?



Try Lenovo g560 win 7 laptop running xp.













Twitter comment attempt invoked.



Urbansurvival comment submission.




Friday June 24, 2016 07:25

Twitter pw sucessfully reset 6/24/16!. After unsuccefully trying since Feb 2015!


Cerberus Capital has made an offer to purchase General Electric's French consumer business with ENI worth $4.6 billion.



 

Monday June 27, 2016 10:07

Too bad wind and solar don't produce more usable electricity?

And has high maintenance and decommissioning costs.

Along with low revenue from sale or erratic and intermittent electric power. Much of which may be subject to an excess power disposal fee.
 
Jason Marks advertised himself at one time as lawyer for altnergy.
Administrative Agencies and Regulatory Law.

jason marks albuquerque.



$160,000,000 + $430,000,000 +50,000,000= $640,000,000 New Mexico wind farm bonds?

+ El Cabo brings total close to $! billion?

Torrence county, New Mexico El Cabo wind farm audio: Friday June24, 2016 Warning at end?
 

Friday June 30, 2016 06:57

 


Google has bought the entire 12-year power production from a yet-to-be-built Norwegian wind power farm to supply its European data centers with renewable energy, its developers said on Thursday.

 



Friday August 5, 2016 14:48

El Cabo wind farm is about 6 miles west, at mile marker 243, of Encino, NM discovered 7/30/2016.


Pics and vids.
 
 

Friday August 5, 2016 15:03

Facebook link apparently removed by Power Engineering..


taller towers and better blades: the cutting edge technologies in modern wind turbines.


 








https://www.facebook.com/maxoutsavingsadvisors



http://www.prosefights.org/irp2014/windscammers2.htm#baca30c

Thursday August 11, 2016 08:30

Field trip visit 2014.

clipper wind turbine benton county indiana.
40 Clipper C-96 2.5 megawatt models manufactured in Iowa.
clipper wind turbine bankruptcy.

terraform power first wind.
 
 
Bankruptcy blows a potential storm toward Sheffield Wind Farm.

SHEFFIELD, Vt. — When alternative energy company SunEdison filed for chapter 11 bankruptcy protection in April, its subsidiary TerraForm Power, which owns Sheffield Wind Farm, promptly issued a press release stating that its assets are safe and will continue to operate “uninterrupted.” ...

Mechanical failures have required harvesting parts from defunct turbines in the area because the manufacturer of the turbine used at Sheffield, Clipper Wind Power, no longer supports that model. [NWW note: It is true that Clipper is long out of business, but the link provided in this story is about a different model at Sheffield University in England.]




According to the group, the coal will be of a high quality to be used without blending in order to cope with gas shortages in the country.





Solar ETFs’ Latest Albatross: SunPower.



Wednesday August 31, 2016 14:14



PNM posts erratic and intermittent power output from Red Mesa and New Mexico Wind Energy Center

Sunday September 11, 2016 07:40
 




Saturday February 11, 2016 11:59




On March 15, 2016 the interconnection customer
proposed a new wind turbine model for the Taiban Mesa II Wind farm (“Project”)
and requested that PNM make a determination whether the proposed modification
represented a Material Modification under the Large Generator Interconnection Procedures (LGIP).The customer proposes to change from the current wind turbine technology of
34 – GE 1.5 MW turbines to 26 – GE 2.0 MW turbines. ..
Obsolete unmaintainable mechanical components and electronics/software?

[t]he customer is not changing the size of the wind farm rather changing the technology of the wind turbine.

This page is formatted with CSS by the author