Patty's Purdue and Lafayette Jefferson high school buddies met in Carmel, IN thursday October 2 - saturday October 4.

Real purpose of essential non-gas-wasting field trip is wind turbine observations, of course.

Mid-America Windmill Museum - Kendallville, Indiana visit saturday afternoon.

Monday February 16, 2015 14:33

Too late?
Towering megawatt wind turbines need strong, large bearings to support their long blades as they rotate. To meet that growing need, engineers at The Timken Co., North Canton, Ohio, have designed UltraWind bearings, a line of tapered roller bearings that range up to 9.6 ft in diameter.


Friday December 12, 2014 08:47

ABB employee Pat Hayes and former Clipper employee Rob Budney exposed possible wind-generated electricity energy scam/fraud?
Also, on August 7, 2012, we completed the disposition of Clipper to a private equity acquirer. The disposition resulted in payments totaling approximately $367 million, which included capitalization of the business prior to sale, transaction fees, and funding of operations as the acquirer took control of a business with significant net liabilities. ...

We have no continuing involvement with the Clipper business following disposition.

Losses at Clipper Windpower have widened in spite of a jump in sales as the maker of wind turbines was hit by defective turbine components and a recent slowdown in demand.

United Technologies announced in March that it planned to sell Clipper and other business units in order to raise $3 billion to buy aerospace parts manufacturer Goodrich Corp. The company told analysts that it bought Clipper expecting a federal renewable energy mandate that would generate huge demand for wind power, but there has not been one.

First Wind said it paid the money for a batch of Clipper's 2.5MW Liberty turbines, which were never delivered. It also said Clipper has effectively stopped manufacturing the turbines.

NextEra said that Clipper was in breach of its warranty obligations.

Even before UTC bought Clipper in 2010 for $385 million, the Liberty turbine has faced well-known problems such as faulty gearboxes and cracked blades.

Accusations fly as First Wind fights Clipper for refund.

Wikipedia clipper windpower site recently reports

The company is doing great and is making money. [3]

Reference to clipper warranty problems removed and poor financial state.

Possible maintenance issues with turbine electronics and software? 



Thursday November 20, 2014 10:53

PNM fleet to go electric.



Wednesday November 19, 2014 19:17

Hiding gwindmill located near Ceder Grove New Mexico only located with telephoto Canon VIXIA HF R100 video camera.

Hidden windmill history?

Returned to video



orimental spinning, but not pumping water, windmill.

Cable secures windmill to ground.

Broken windmills have aesthetic value.

Amazon search

ornamental windmill.



ornamental wind turbine.



Broken wind turbines do not have aesthetic value.
No power or erratic power output.
Broken wind turbine definition?
And should be decommissioned. Not at public expense.




Tuesday November 18, 2014 13:13

Page located with TracFone LG L39C Android phone using Google app.



#foiadata added to link along with 'webinar outstanding' message.

Shared with Pat Hayes.



on his mobile phone. :)

Recovery of $22,036 stolen from our Sandia Laboratory Federal Credit Union
retirement-project insured [NCUSIF] saving accounts also in focus using high tech tools.

Erratic wind and solar output data in focus.



Not words.

FOIA used to get data.





Jack Ellis audio.
John Sobolewski.



Slide 11, Hayes webinar.

Sandia National Laboratories.



Prosperity Energy Storage
Evelin Wheeler
PNM Executive Director Generation Development





This Sahar Mehrroz.

Sahar Mehrroz.

Afterword.



Tuesday November 18, 2014 11:55



attachment pdf.

saft cowessess nation src.

1 The $4.7-million project involves the erection of an 800 kW Enercon E53 wind turbine connected to a lithium-ion battery with 740 kWh of electrical storage capacity.

2 But after weeks of analysis the turbine manufacturer Enercon has released an interim report identifying material fatigue as the cause of the accident.

3 Wind turbine power production is inherently volatile, and can be very difficult to predict, even five to ten minutes in advance, let alone one day in advance. We’ve recorded many instances where the turbine has both ‘ramped’ up by 600 kW of output and decreased by 600 kW within a five-minute window. This is equivalent to 150 homes coming online almost simultaneously, and then going back offline – and this is just one turbine!

4 saft batteries.

gvea fairbanks energy storage.

1 Outages Prevented. Effective?

2 U.S. electricity blackouts skyrocketing.

3 Storage in Action and Lessons Learned. Listen to phone conversation.
Some applications may not make economic (e.g., time - shifting ) or operational sense.
4

New Mexico windmill field trip Saturday November 15, 2014.


Friday November 14, 2014 12:26

Three questions: energy storage.





Moderation.



Approval granted.









erratic wind power output.

Erratic wind presents challenge to alternative-energy producers.




Our focus is on maintence and decommissioning cost of wind turbines along with revenue from electricity sales.

And the liberal arts 'educated' incursion into altenergy.

Subject: RE: American genocide, altenergy and your books
Date: Wed, 3 Sep 2014 09:01:08 -0500
From: Forrest Mims fmims@aol.com
To: 'william payne' bpayne37@comcast.net
CC: leila_gh_art@yahoo.com, fmims@aol.com

Hi Bill,

The dreamers who think we can shift away from fossil fuels overnight simply have no idea of what they are promoting. Nor do they take into consideration the environmental compromises required to manufacture, maintain, install and decommission wind and solar installations.

Forrest  

Software cost is only about 20% at time of deployment. 80% of cost is in maintenance [bug fixing] and enhancement, experience shows.

Wind turbines contain lots of software and electronics, we were told by High Lonesome wind farm engineer Mike.

Wind turbine replacement electronics may prove a problem too? In addition to mechanical problems, of course.



Friday November 14, 2014 12:56

2009.



Frozen pipes and wind destroys windmills.

Field trip to Yrisarri New Mexico



Tube construction of tower expensive?



Tools.









Videos.

1 No zoom.

2 Overview.

3 Sliding down the tower.

4 Broken pump rod!

5 Anemomter..

Drone jeep accident.

Dean Bennett sent beautiful illustrated catalog of aermotor information several years ago.

Sunday November 9, 2014 17:08

We will all drive a Tesla in 25 years: Ron Baron.

 



Exact link.

Enron Wind. Father of large-scale wind turbines?

Saturday November 8, 2014 08:51

No response from Scott at Brandenburg
Brandenburg, established in 1968, is one of the nation’s premier firms specializing in demolition and environmental remediation, which includes asbestos abatement, hazardous material removal, soil remediation, asset recovery, and site preparation.
yet.

Listen to our conversations.



Thursday November 6, 2014 11:36

Erratic power output of both wind and solar in focus.

Solar Will Shine Brighter With Smarter Inverters.
J. Williams • an hour ago

The timing of that PV power can be critical and the grid must have stand-by power ready to go to fill in. Paul Mauldin of Transmission & Distribution World wrote a very insightful article a year ago about the challenges of integrating higher percentages of highly variable generation (solar, wind). http://tdworld.com/generation-... He produce a nice graphic of what the power profiles might look like in 2020 for California. People traditionally think mid-afternoon is peak, but it really tends to be skewed towards the evening. Check out his article. We are really going to have to take a good hard look at what powers our grid and how to manage the generation load shift from solar/wind to reliable power as the conditions change. Push these alternative energy sources without addressing these issues and we will feel the growing pains.  


Thursday November 6, 2014 07:25

Average electricity prices around the world: $/kWh.

1 Denmark $.41.
Denmark was a pioneer in developing commercial wind power during the 1970s, and today a substantial share of the wind turbines around the world are produced by Danish manufacturers such as Vestas and Siemens Wind Power along with many component suppliers. Wind power provided 33% of Denmark's energy consumption in 2013 and 41% of Denmark's electricity consumption in the first half of 2014.
2 Germany $.35.
3 Spain $.30

are altenergy leaders.

Wind power in Denmark



:)


Tuesday November 4, 2014 13:37

Hello Scott,

Three quotes

1 The bottom line is that even if the permitting agency allows the salvage credit, the total net cost of decommissioning this project today would be $10.4 million ($83,900/turbine). Our analysis quantified the large scrap price and demo cost escalation risk being assumed by the local community. To protect the community, the permitting agency should require a bond of a minimum $100/K per turbine ($12.4 million) to capture demolition cost escalation risk. If the wind developer can convince the bonding company of the high salvage value, then they should be able to negotiate a lower rate for the bond. If they were right, there would be very little price difference for a larger $12+ million bond. Shift the risk to the bonding company. Let the developer and bonding company assume the price risk — not the community.

2 Date: Wed, 3 Sep 2014 09:01:08 -0500
From: Forrest Mims fmims@aol.com
To: 'william payne' bpayne37@comcast.net

Hi Bill,

The dreamers who think we can shift away from fossil fuels overnight simply have no idea of what they are promoting. Nor do they take into consideration the environmental compromises required to manufacture, maintain, install and decommission wind and solar installations.

Forrest

3 Gearboxes in wind turbines, more than those in any other application, tend to fail prematurely. In fact, at some wind projects, up to half of all gearboxes fail within a few years.

will hopefully make reason for my phone call clear.

Clipper wind turbine decommissioning rough cost estimate please.

http://en.wikipedia.org/wiki/Clipper_Windpower

https://www.google.com/?gws_rd=ssl#q=clipper+wind+turbine+weight

regards,
bill


 


Thursday October 30, 2014 10:51

Feed-In Tariffs: A Tool for Increasing Economic Equality in the US?



Indiana wind FOIA required.





Thursday October 30, 2014 07:45

After Fukushima, Japan gets green boom _ and glut.


Wednesday October 29, 2014 09:07

Sunday October 26 leaf obeservation field trip to east mountains.

Google Android L39C Tracfone used to take mp4 videos

1 Yrisarri, NM fairly-new windmill.

2 Jacobs lattice wind turbine off Frost road.
Jacobs has a 'tail'.

jacobs wind turbine.
3 Michael Spiller's wind turbine several hundred yards from Jacobs.
Marketing, sales, design and installation of Southwest Windpower’s wind generators.
Skystream 3.7™, installed, costs approximately $12,000 to $15,000,

XPWR. Income Statement.

MID-AMERICA WINDMILL MUSEUM.

No 'tail'. Or are blades tail?

Clippers don't have a 'tail' either.
On May 10, 2002, following the Enron scandal, General Electric acquired the assets of Enron Wind Systems

Koyote free mp4 to wmv format conversion.
 


Wednesday October 29, 2014 07:51

Inclinometer [tilt] sensors too?

Most people wonder how much power a wind turbine can produce, and never stop to wonder how much power a wind turbine requires to operate. Mechanical engineer Jerry Graf believes that it is long past time for people to ask that question:

Big turbines often incorporate rechargeable batteries or ultracapacitors to power their own electrical systems. When those get depleted, the power must come from the grid. This power goes into running equipment such as yaw mechanisms that keep the blades turned into the wind; blade-pitch controls that meter the spinning rotor; aircraft lights and data-collection electronics; oil heaters, pumps, and coolers for the multi-ton gearbox; and hydraulic brakes for locking blades down in high winds.
 
yaw wind turbine.
The modern yaw drives, even though electronically controlled and equipped with large electric motors and planetary gearboxes ...

yaw drive wind turbine failure.

wind turbine blade pitch control system.

Wind turbine design.

Thursday October 23, 2014 14:48

Conversation with Ms Sarah Hoffman 260-385-9904 Thursday October 23, 2014.







Electronics, in addtional to mechanical, failures may plaque the wind turbine business?

Enertech Inc., a Newton-based manufacturer and refurbisher of wind turbines, has closed its doors.

The company has filed for Chapter 7 bankruptcy liquidation.

Clipper Windpower is a wind turbine manufacturing company founded in 2001 by James G.P. Dehlsen, who also founded Zond in 1980.[1] In December 2010 Clipper Windpower was acquired by United Technologies Corporation. It was sold in 2012 to Platinum Equity LLC.[2] The company has been beset with financial problems resulting from warranty claims.[3]

Texas Grid Finally Catches Up With Wind Power Output.





Wednesday October 22, 2014 09:23

David B McCoy notification response.










Santo domingo aermotor.


Saturday October 18, 2014 12:41






Energy Center and Global Sustainability Institute, Purdue University,
Monday October 13, 2014 audios.

1 Indiana Center for Coal Technology Research lost funding.

2 Melba Crawford.

3 What to do?

4 Erratic wind turbine power output lecture by Dr Pankaj Sharma.

5 Full conversation with Dr Sharma.

Sunday October 19, 2014 21:13

Gearboxes in wind turbines, more than those in any other application, tend to fail prematurely. In fact, at some wind projects, up to half of all gearboxes fail within a few years.

There are several reasons for this, including the relative newness of the industry, the rapid evolution of turbines to extra-large sizes, poor understanding of turbine loads, and an emerging (and largely unexplained) failure mode in turbine bearings called axial cracking. ...

The target service life of the typical wind turbine is usually about 100 million main-shaft revolutions over 20 years, but most turbines never survive that long without problems. So to boost reliability, turbine manufacturers are working to understand and address the causes of premature failures. The effort is paying off. Data collected by government labs such as the National Renewable Energy Laboratory, part of the U.S. Dept. of Energy, Golden, Colo., and Sandia National Laboratories, Albuquerque, confirm gearbox reliability is steadily improving.

http://rbbengineering.com/

rob@rbbengineering.com
1-805-280-9044

ROB BUDNY is a mechanical engineer and expert in wind-turbine design, analysis, certification, operation, and maintenance. He first worked in the aerspace industry for Lockheed-Martin and Northrop Grumman, where he served as a design engineer and stress-and-fatigue analyst. In 2005, Budny joined Clipper Windpower, where he worked until 2013 on gearboxes, gearbox-failure analysis, generators, and pitch and yaw systems.

1
In September, 2007 Clipper Windpower, based in California, received an Outstanding Research and Development Partnership Award from the U.S. Department of Energy (DOE) for the design and development of its 2.5 MW Liberty Wind Turbine, one of the largest wind turbines manufactured in the U.S. at the time. The turbine was developed under a partnership with DOE and its National Renewable Energy Laboratory (NREL).

Monday October 20, 2014 09:28

2

The GE 1.5 megawatt series of wind turbines was developed with the cooperation of the United States Department of Energy.[9][10]

3

V82-1.65 MW (phased out).

Danish company Vestas is part of a project team that has scooped $4.5m in US funding to develop a high-speed manufacturing process for composite products. ...

Cash is part of the Department of Energy's $23m Innovative Manufacturing Initiative, the third round of which was announced today and spread across 12 different projects.

The Department of Energy and Vestas Wind Systems last week joined with Sandia National Laboratories and Texas Tech University to break ground on a new state-of-the-art wind turbine test facility in Lubbock, Texas, that will focus on how turbines at wind farms affect one another.

4

Domion Virginia Power has been awarded an additional $47 from the Unitied States Department of Energy ....

5

SOUTHFIELD, MI, October 19, 2004 – BP today dedicated the first hydrogen fuel station of a US Department of Energy project designed to facilitate the field-testing of fuel cell vehicles and fueling infrastructure in the United States and the next step in bringing hydrogen to broad market distribution.

6

IPL and enXco announced their plan to build the wind farm in April, 2008

Indianapolis Power & Light - Residential Energy Incentives Program.

The financing includes a construction plus a 15-year term loan; and a bridge loan to the ITC cash grant from the US Department of Energy,

Construction on the Lakefield Wind Project commenced in late September 2010 and is on schedule to be fully operational in the Fall of 2011. Developed by enXco, the project consists of 137 GE 1.5 megawatt turbines with the capacity to generate clean renewable energy for more than 68,000 homes. Indianapolis Power & Light (IPL) will purchase the power generated under a 20-year power purchase agreement. This marks our second wind project to develop and build with IPL - the 106 MW Hoosier Wind Project in Benton County Indiana began delivering electricity in November 2009.


On May 23rd, 2008, the U.S. Department of Energy released a report titled "20% Wind Energy by 2030" stating that, even with contemporary wind technology, it will be possible for the U.S. to generate 20% of its electricity through wind farms by the year 2030, a move which would reduce natural gas consumption by 11% and coal consumption by 18%. ...

The U.S. has relied heavily on tax subsidies and direct government support to move the wind energy forward. Historically, wind energy has benefited from an investment tax credit, especially in California which saw a host of installations of wind turbines in the 1980's. Unfortunately, these turbines never needed to actually generate power in order to receive the credit.

Wind and coal field trip 10, 18-19, 2014

Santo Domingo pueblo New Mexico relatively new windmill.


Tuesday October 21, 2014 07:04



 
With Aermotor Windmills, you’re choosing the lowest cost pumping power on Earth. The Aermotor Windmill puts the wind to work, saving fuel and money, with virtually no maintenance!







Video.

(505) 465-2214/2215

Cumbres and Tolec coal-fired train.

CO2, global warming, MSM, .... .

Wind and solar altenergy is a liberal arts 'educated' business?

Obama war [jihad] on coal EPA target?

1 BTU/pound coal?
2 Puff, puff. ...
3 Puff, puff. ....
4 Puff, puff. ....
5 Puff, puff. ....

Videos downloaded through My Computer with drag and drop then converted from canon MTS to wmv with Koyote.

Malware can be downloaded with Koyote. But Koyote does not contain malware. Be careful what you check on download.

Thursday October 16, 2014 15:58

1 Columbus to Lafayette reason video.

2 Not spinning wind turbine - Fowler IN.

3 Identfication of 2 turbine.

4 Fowler IN wind turbines.

5 Second not spinning access road.

6 12-611.

7 Not spinning turbines identification.

8 Third not spinning located.

9 Blade of not spinning turbine.

10 Windmill - not working.

11 Earl Park IN - Lots not spinning.

12 Pan of not spinning turbines.

13 West Lafayette IN fall colors.

Construction, installation, maintenance, decommissioning cost issues.

Revenue from sale of electricity sufficent to cover these costs


 



https://engineering.purdue.edu/Wind





Dr Sharma aids finding requested information.





 



http://igs.indiana.edu/bookstore/details.cfm?ItemID=2171&Pub_Num=OFS12-07

http://igs.indiana.edu/


Small-scale VAWT with solar panel innovcation.



Video.



Nokero.


 








 




Wednesday October 15, 2014 09:01






Possible 2014 updates caused return to Purdue to visit Ms Marty Irwin.



Marty Erwin possible casulty of Obama war [jihad] on coal conversation.


Pankaj Sharma.

Saturday October 11, 2014 16:59

 

Flint & Walling Inc.

tech@flintandwalling.com
webmaster@flintandwalling.com
By the 1930s and 1940s electric water pumps began to supersede windmills in popularity as more and more rural areas received electricity. In response, Flint & Walling pioneered the development of convertible jet pumps, centrifugal pumps, and sump pumps. In the 1950s the company began to manufacture submersible pumps. [Any Grundfos competitors?]
Patty born in Kendallville.



1 Spinning windmils. 40o F and windy.

Windmills can topple over in high winds. Walk through windmills not taken.

St. Ignace next stop. And Mackinac island.



1 Clop clop ...

2 More clop, clop.

3 Horses pull about 50 yards uphill, then have to rest.


Soo Locks day trip.



4 Video. [.mov files 10x larger than wmv files discovered here.]

Soo locks visit Tuesday October 7, 2014 revealed

On the Great Lakes, the most prominent commodities shipped through the Soo Locks at
Sault Ste. Marie, Michigan, for the shipping season of 201 2 were :

% of Total Commodity
62% Iron ore
18 % Coal
8% Wheat
6% L imestone
6 % All ( 30+ ) others

[Tons, volume, dollars???]


Monday October 13, 2014 08:59

We're working to make wind energy as cheap and dependable as coal and natural gas. We envision an industry that supplies at least 20% of U.S. electricity from clean, sustainable wind power. Purdue.

Wind turbines are designed to operate unattended and with minimal maintenance for up to 25 years.
Not spinning turbines reasons?














Saturday October 11, 2014 18:57

PNM proposes to replace coal with natural gas, wind, and solar. Hahaha?
For the week ended October 4, 2014: Estimated U.S. coal production totaled approximately 18.6 million short tons (mmst) This production estimate is 6.9% lower than last week's estimate and 10.2% higher than the production estimate in the comparable week in 2013.

Power Engineering.


Sunrise Carlisle Facility.

Rereat mining?
At the Sunrise Carlisle Mine, our surface and underground operations work in tandem to yield more than 3 million tons of coal annually. Using the Room & Pillar method, we safely and efficiently extract coal from beneath the surface.

Let's find out.

Saturday October 11, 2014 19:38

1 Construction
2 Installation
3 Maintenance
4 Decommissioning

identified as costs for owners of wind and solar generation of electricity projects.

Focus is now on revenue to fund 1-4.

Examples required.

New Mexico Wind Energy Center revenue from sale of electricity insufficient to pay stated 8 employees' wages let alone fund needed maintenance and possible decommissioning?
Bill,

The information you are requesting is the type of information that we are happy to provide in our regular IRP meetings. You are encouraged to ask the question at the meeting and you will receive an answer. The price per MWh for generation from the New Mexico Wind Energy Center is $27.25. Annual generation from the facility is:

2003 211,931
2004 514,414
2005 513,019
2006 528,567
2007 500,420
2008 577,506
2009 533,289
2010 552,242
2011 579,900
2012 546,321

2003 is a partial year because the facility was under construction and did not come on-line until sometime after mid year. 2013 generation through September was 340,119 MWh. A formal request under the New Mexico Inspection of Public Records act is unnecessary because PNM files this information with the New Mexico Public Regulation Commission in public documents. Also, since PNM is not a public entity, the Public Records Act does not apply to PNM.

Thank you for your continued participation in our Integrated Resource Plan. You are one of the few who have been there from the beginning.

Pat O’Connell
 

Benton county data?

Saturday October 11, 2014 10:25
Friday October 10, 2014 18:09 http://en.wikipedia.org/wiki/Wind_power_in_Indiana Wind power midwest field trip Indiana and Michigan October 2 - 14, 2014
             
Wind farm County(s)  County(s) Turbine
model
Power
per
turbine
(MW)
No. of
turbines
Total
Nameplace
Capacity
(MW)

Online Developer  Operator   Power
purchaser
Benton
County phase
Benton GE sl/sle Gen4 1.5 87 130.5 2008-04 Orion Energy Orion Energy Duke, Vectren
Fowler Ridge
phase I Vestas
Benton Vestas V82  1.65 182 300.3 2009-04 BP, Dominion BP, Dominion AEP,
Domioion
Fowler Ridge phase I
Clipper
Benton Clipper 2.5 2.5 40 100 2009-04 BP, Dominion BP, Dominion AEP,
Domioion
Fowler Ridge
phase II
Benton GE sl/sle Gen4 1.5 133 199.5 2009-12 BP, Dominion BP, Dominion AEP,
Vectren
Hoosier Benton REpower 2 53 106 2009-08 IPL, enXco  IPL, enXco  IPL